I have been using the Cabling feature of Pro/E Wildfire 3.0 to run a bunch of lines in a heating cooling system to verify feasibility. Come to find out we will need these lines built. Wondering if I can somehow transfer the cable routings to solid parts so that they can be converted to .igs files or something I can send to a vendor. Any help would be much appreciated!!!