hai
I have prblem with INTRALINK UPDATE.
i checkedout assy&drawing with the release level of CONCEPT.
i modified the drawing and checked in
then i promote the drawing from concept to released(in commonspace).
then i update the same drawing in my work space.
but the status of release level is same as concept.
as i know update is nothing but checkout.
why the status of release level is not changing in workspace.
but the sme drawing if i checkedout in another directory the release level is shwing currect(released)
pl suggest the prblem with update
regards
I have prblem with INTRALINK UPDATE.
i checkedout assy&drawing with the release level of CONCEPT.
i modified the drawing and checked in
then i promote the drawing from concept to released(in commonspace).
then i update the same drawing in my work space.
but the status of release level is same as concept.
as i know update is nothing but checkout.
why the status of release level is not changing in workspace.
but the sme drawing if i checkedout in another directory the release level is shwing currect(released)
pl suggest the prblem with update
regards