Legacy40234
New member
Hi all:
Is it possible to have a master BOM and with RPT_QTY listed and use it in the repeat region relation to overwrite the QTY parameter of each component?
For example:
let say I have component name A with has a parameter QTY. In the BOM the RPT_QTY shows 4 but the asm_mbr_qty only show 1. Can I use repeat region relation to overwrie the asm_mbr_qty?
Thanks.
Is it possible to have a master BOM and with RPT_QTY listed and use it in the repeat region relation to overwrite the QTY parameter of each component?
For example:
let say I have component name A with has a parameter QTY. In the BOM the RPT_QTY shows 4 but the asm_mbr_qty only show 1. Can I use repeat region relation to overwrie the asm_mbr_qty?
Thanks.