peter_hajdu
New member
Hi
We stared with WF2 at the beginning of this year. (M130)<?:namespace prefix = o ns = "urn:schemas-microsoft-com
ffice
ffice" />
Previously we used PROE2001.
We have lots of big asm drawings we made in PROE2001 and now when we
Work on them in WF2 a simple dimension deleting or moving process take us 10-20 min!!!
However PROE2001 could handle these drawings with normal speed.
Now when we e.g. delete one dimension, the proc. Usage goes up to 100% and the process takes 10-20 min for all our users.
Is it
We stared with WF2 at the beginning of this year. (M130)<?:namespace prefix = o ns = "urn:schemas-microsoft-com
Previously we used PROE2001.
We have lots of big asm drawings we made in PROE2001 and now when we
Work on them in WF2 a simple dimension deleting or moving process take us 10-20 min!!!
However PROE2001 could handle these drawings with normal speed.
Now when we e.g. delete one dimension, the proc. Usage goes up to 100% and the process takes 10-20 min for all our users.
Is it