Continue to Site

Welcome to MCAD Central

Join our MCAD Central community forums, the largest resource for MCAD (Mechanical Computer-Aided Design) professionals, including files, forums, jobs, articles, calendar, and more.

total_cost = rpt_qty * asm_mbr_cost

proee

New member
I was wrote table down text.


table--->repeat region--->relation---> selectI'm repeat region

enter this into the relations editor
total_cost = rpt_qty * asm_mbr_cost


but relatonserror : "asm_mbr_cost" is uncollect.my proe unknown that.


I wasset paramater "total_cost"in asm and "cost" in part


Whydon't know"asm_mbr_cost" ?& seting condition "config.pro" ?
Edited by: proee
 
Your relation seams correct:total_cost=rpt_qty*asm_mbr_cost


See if you don't have "cost" parameter as string in parts, should be real number.


And you don't have to put "total_cost" in the parts as aparameter. (maybe this is what's causing the error, delete it from part parameters, see if it works).


total_cost is a relation parameter that is automatically created in repeat region parameters.


You show it in a repeat region as &rpt.rel.total_cost
 

Sponsor

Back
Top